With the development of data center operation and the increasing demands of products, pre-termination products have come into being, bringing a better solution for data center’s business. In the past, the data center always adopted the solution of welding, today’s data center, however, with the increasing demands of products, has already adopted pre-termination products, which support the use in the places requiring high-density, quick arrangement, and high performance.

What is pre-termination?

The so-called pre-termination fiber refers to the terminals of the fiber are connected with the certain modules and twisted-pair fiber group qualified in the test. According to the plan in advance, all modularized fiber products with immediate insertion and use employed when the factory finishes manufacturing and tests insert the terminals of pre-termination fiber into the corresponding empty distribution frame and then the installation of the fiber system is finished.

Advantages of pre-termination fiber products

1. Adapting to the new model of fiber wiring solution with the wiring demand of high density and reliability compared to the welding or quick connection technologies;

2. No welding, plug and play, fast wiring;

3. Convenient maintenance and management; supporting extension.

In the former fiber link, most losses come from melting point. Basec pre-termination fiber can not only reduce the loss of the melting point in the fiber link to zero but transmit stable with immediate insertion and use, which is very convenient since the past step of wielding fiber is left out, thus playing a significant role in the premises distribution system. 

Application of pre-termination fiber technology

1. Internet Data Center(IDC)

2. Fiber to the Home(FTTH)

3. Fiber to the Desk & Multi Dwelling Unit(FTTD & MDU)

4. Other special wiring environments: wind electricity, field, military…

5. Applied to Internet Data Center(IDC)

In accordance with the development trend of the data center, Basec published the solution of fiber pre-termination data center. 

fiber pre-termination data center

As shown in the above picture, different colors represent different areas where different distribution products are employed. The corresponding products are as follows:

corresponding products for different areas      

related products

Applications of MTP-DLC 10G

1. Male connector for MTP-MTP pre-termination fiber cable

2. Female connector for MTP-MTP fiber patch

3. Key-up to Key-down (method-A) for MTP adapter

4. Method-B fiber cable advised for MTP-MTP pre-termination fiber cable with the transmission of 40G/100G

5. Method-C cable advised for MTP-MTP pre-termination fiber cable with the high-density transmission of 40G/100G

Applications of MTP-MTP 40G/100G

1. Trunk fiber: MTP-MTP (Type-B) with male connector connecting the two ends

2. Adapter types:  Key-up to Key-up(Type-B)for MTP adapter

3. Device: MTP-MTP (Type-B)jumper wire for jumper wire

Type-B fiber cable is used in MTP trunk terminal and patch terminal to turn 40G link automatically according to the corresponding Tx1-Rx1, greatly improving future’s convenience of maintenance.